Carmel Tunnels

  • Location:
    Haifa
  • Period:
    2018
  • Area:
    40,000 m2
  • Project Description:

    Cleaning 4m-high concrete walls, total length of 10 km, curb cleaning with street broom

    Cleaning carried out in two tunnels with rising slopes that accumulate more grime, completed successfully in record time, and followed by a work order for one of the descending tunnels